EN

Difference between TNF construction method and
pile foundation system

Home > TNF construction method > Difference between TNF construction method and pile foundation system
4 comparison points
POINT 1: NO uplifting
TNF construction method
  • There is no difference in level due to subsidence with the surrounding ground.
  • There is no need for repair of the pavement due to uplifting.
Pile foundation system
  • Can see the uplift due to ground subsidence.
POINT 2: Piping equipment underground is safe
TNF construction method
  • Because the soil and the foundation is integrated with the TNF construction method,
    Piles will not uplift due to subsidence and can prevent damages to the piping equipment underground or under the slab.
Pile foundation system
  • Damages to the piping equipment underground or under the slab.
  • If there are damages to them, the building may not function, as it should.
POINT 3: Easy removaing and low cost
TNF construction method
  • Removal process is unnecessary so can save costs.
Pile foundation system
  • Disposal expenses will be incurred at removing.
POINT 4: The ground can be shallow
TNF construction method
  • Because it becomes a stable ground due to soil reinforcement, there is no need to dig deep down like the pile foundation.
  • It is TNF construction method's advantage that it is possible to build firmly even on a shallow ground.
  • It is possible to construct on top of ruins and on industrial waste disposal site.
Pile foundation system
  • It is not possible to construct piles if there are ruins or industrial waste underground.