1. Slab Foundation Joined with Reinforced Ground Layer
A unique construction method in which the slab foundation and reinforced ground are integrated as a single unit.
Significantly reduces the need to use rebar, concrete, formwork etc.
2. Improve Site's Existing Ground
Improving the surface of on-site ground. possible to use the soil disposal to improvement.
Minimize the cost of carrying out the soil disposal or bringing in gravel into site
3. Shorten Construction Time
TNF method allows for pouring directly into ground reinforcement without using any formwork.
By reducing the need for extensive formwork, construction times can be kept short to save valuable time and money.
4. Reduce Removal Cost
With TNF method, the reinforced ground can be used again as a base, thus significantly reducing removal cost.
Savings in removal costs in the case of an order for building removal due to a fixed-term land leasehold.
The removal cost is about one-half of the construction cost
With the conventional construction method
With the conventional construction method
ALMOST DOUBLE
Preserved underground objects
LOWER LAND PRICE
With the TNF construction method
The removal cost is the construction cost's
About one-half
Reinforced body can be reused after removal
From "regarding criteria for use of surplus soil" by Ministry of Land, Infrastructure, Transport and Tourism
*Will depend on the region.
*It may be different depending on the property.